
Structured Cabling
Certified network infrastructure built on 30 years of Gulf Coast expertise
Certified Infrastructure
Professional Cat6/Cat6A installation tested and certified with Fluke DSX CableAnalyzer. Every cable run meets TIA-568 standards with full documentation for warranty and compliance.
End-to-End Project Management
AOP manages your cabling project from initial site survey through final certification. One provider for design, installation, testing, and ongoing support — with minimal disruption to your operations.
Plan Your Network Infrastructure
AOP will survey your facility, design the optimal cable plant, and deliver a certified installation — on time and on budget.
Schedule a Free Site SurveyComplete Cabling Solutions
AOP handles every aspect of your network infrastructure — one provider, one call, one certified result.
Cat6/Cat6A Copper
Office and data center horizontal cabling with certified test results for every drop. Support for PoE, PoE+, and 10GbE applications.
Fiber Backbone
Single and multi-mode fiber for building risers, campus links, and long-haul runs. Fusion splicing and OTDR testing included.
Cable Certification
Fluke DSX CableAnalyzer testing with full documentation for every drop. Pass/fail reports for manufacturer warranty and compliance audits.
Rack & Patch Panel
Server room buildouts with cable management, labeling, and TIA-568 compliance. Clean, serviceable installations any technician can maintain.
Cable Tray & Pathway
J-hooks, cable tray, conduit, and pathway design for clean, accessible cable runs. Plenum-rated materials for above-ceiling installations.
Wireless AP Mounting
Access point placement, mounting, and cabling for enterprise Wi-Fi coverage. Coordinated with your wireless survey for optimal signal.
Frequently Asked Questions
- What types of cabling does AOP install?
- Cat5e, Cat6, Cat6A, and single/multi-mode fiber. We match cable spec to your bandwidth, distance, and environment requirements — from office runs to industrial plant backbones.
- Does AOP certify cable installations?
- Every cable run is tested and certified with Fluke DSX CableAnalyzer. You receive a full certification report documenting pass/fail results for each drop — required for manufacturer warranty and compliance audits.
- Can AOP cable an occupied building without disrupting operations?
- Yes. We schedule pulls during off-hours and use existing pathways (ceiling plenum, conduit, cable tray) whenever possible. Our team coordinates with your facilities manager to minimize disruption.
- Does AOP handle server room and rack buildouts?
- Full rack and stack — patch panels, cable management, power distribution, labeling, and documentation. We build to TIA-568 standards so any technician can service the room.
- How long does a typical cabling project take?
- A 50-drop office build typically takes 3-5 business days from survey to certification. Larger projects (warehouses, multi-floor, industrial) are scoped during the free site survey.
Stop Managing Vendors. Start Growing Your Business.
One call. One partner. Fiber, IT, cloud, security, and equipment — all from AOP. Schedule a free 30-minute strategy session with our team.
GET YOUR FREE STRATEGY SESSION